About sarfraz ahmad:
Sarfraz Ahmad
Nationality: Pakistani
Cell No: +92 303 4441397
CNIC No: 3310003900553
Date of Birth: September 15, 1979
Address: H#36, St#25, Madina Town Faisalabad. Punjab
SUMMARY:
I'm First Class Boiler Engineer from Govt, of Pakistan Punjab and Diploma of commerce from Punjab Board of Technical Education Lahore. I have knowledge and practical experience of Mechanical maintenance and Productivity awareness program give support to build my career in the field of engineering. Always have an ambition to build up a complete and incorporated coordination for autonomous, preventive, conditional based maintenance with achievable productivity.
Specialties:
§ Spares, Un badging and Localization
§ AIB (Maintenance for Food Safety)
§ Lean Six Sigma implementation to peruse productivity
§ SAP PM and MyBuy
§ People Management
§ Immediate RCA, downtime analysis
§ Total productive maintenance
§ Decision Making
§ Innovative ideas
§ MESS
§ Projects
ACADEMIC QUALIFICATION
Degree | Year | Field | Board/University/ Institution |
1st Class Boiler Engineer | 2019 | Boiler | Govt, of Pakistan Punjab |
Boiler in Mechanical Technology | 2008 - 2010 | Boiler | Govt, of Khyber Pakhtunkhwa |
D.Com | 1995 - 1997 | Commerce | GCTI |
Matric | 1993 - 1995 | Science/TSC | Govt, Technical High School |
DAE | 2019 | Mechanical | 1st & 2nd year passed 3rd year Continue |
Professional Experience:
From Sep 2006 to present Reliability Engineer and having experience in the following fields,
Main Job Responsibilities:
§ Commissioning of KK, PC50, PC32, Cheetos lines and also 4TPH steam Boiler, KHX, Thermal Boiler, AUH with the support of project and team capability
§ Planning & Execution of Planned Maintenance, Shutdowns & Modification Jobs while driving own staff & engaging third parties
§ Responsible for all time of maintenance including preventive, time and conditioned based maintenance
§ Trouble shooting of different gears, Different type of pumps, conveyors, elevators, different type of compressor, diesel & Gas generator, water turbine, absorption chiller, Burners, steam boilers, waste heat recovery boiler, oil heat exchanger, Air handling units, Cooling towers, dosing pump, Air blower, KMG vibrators with the support of OEM & manuals
§ Development of the Preventive Maintenance plans with assistance from Original Equipment manufacturers, manuals & self-experience.
§ Actively participated in preventive maintenance time to time with proper logging and traceability as per requirement of system. And ensure minimum down time due the failure of Mechanical equipment and manage all related spares inventory to reduce the downtime
§ I was the solely responsible to lead all project for pre-projects/post project meetings, budget, casting & planning, preparing of BOQs with foreign companies (Heat & control, KMG, Flo-mech, WMFE, Kington, R & D, weishaupt & local contractors regarding services, material requirement, and ensure the quality of work as per PI/HSE standards and handed over this project within the defined timelines
§ Support to production to implement TPM initiative at Process areas
§ Team capability building related all types of shift tasks like troubleshooting, requisition, preventive plant maintenance through PTW, SOP, RCA
§ Execution of Food safety and EHS standards for the quality work
§ Ensure sustainability on every task including energy conservation, resources optimization
§ To develop mechanical prospects maintenance plans, spares identifications and develop team capability.
§ I have worked on MESS agenda with HSE team and implemented on all areas.
§ Actively participated and arranged data for SAP PM maintenance plan and GO LIVE in December 2017
§ Facilitation and implementation of Kaizen initiatives & 5S across of the plant.
§ Arranged data Food safety Audit, IPS audit and finally the Audit with American Institute of Beacon (AIB) once in a year. We have achieved the Scored 900+ marks in 2019 AIB Audits.
Rafhan Maiz Product Pvt, Ltd. (from 2004 – 2006)
§ It was a food company and producing the food items. I worked here as a Boiler Technician. Also worked in shifts for optimum operation of plant and ensure to eliminate the chances of re-work after maintenance.
Additional Trainings:
§ 05 Days Training of KK Super high capacity Extruder (R&D USA)
§ 05 Days Training of Sundar EHS Academy
§ 05 Days Training of Engineering Academy
§ 05 Days Training of Improve product specification (IPS)
§ Introduction to MESS Standard, Risk Assessment Methodology & Functional Safety Overview (TUV AUSTRIA )
§ Prevention of boiler accidents & fuel saving (NPO Pakistan)
§ 2nd Industrial Boilers & Pressure Vessels Conference Showcase Pakistan (SKEN)
§ Fire investigation and reporting (EHSAS)
§ Managing Yourself (One Tree Hill)
§ Effective Business Writing & Communication Skills (CMD)
§ Decision Making (Octara)
§ Development Course for Supervisor (Pakistan institute Of Management)
§ 5S-Five Keys to A Total Quality Environment (IQCS)
§ Dashboard Reporting Using Excel-2010 (Viftech)
§ Centrifugal pumps training (KSB)
§ Basic Fire Fighting Training (FASTC)
§ English language skills (Leading Edge)
§ TPM & 5s implementation
§ SAP PM Plan
§ Time management
§ Also having knowledge of Computer software MS office, Words, Power point, Outlook etc.
Key Projects:
1. Participate in Commissioning and startup of PC50, PC32, KK, Cheetos, Thermal Boiler, KHX & Steam with foreigner engineers and project team.
2. HOW boost up at PC32.
3. Equipment life enhancement project. (Vibrators, Barrel Washer, Meal Mixer)
4. Water Sustainability Projects. (Cheetos Extruder Chiller, UPVC pipe line, Water Flow meters, ROCD water recycled at both lines)
5. EHS Projects. (MESS mechanical related projects, Hoist system, Platforms)
6. Plant facilitation projects. (Main Hand Wash area & Building renovation and paints, Floor paints)
7. Peel Recovery Project.
8. Auto Door Project.
9. KK Automation project.
10. PC32 Fryer Blancher Heat Exchanger project.
11. KK burner stack heat reutilization at Cheeto Oven (1st idea won in competition)
12. CAPEX planning and execution.
13. Spare, Un batching and localization leading to the productivity.
14. Extra endeavors Support in MGF plant.
15. Spare parts ROL/ROQ optimization project.
16. Front line team capability development.
Experience
I have rich experience of utilities operation/maintenance and also mechanical maintenance
Education
1st Boiler Engineer
Two years diploma of mechanical boiler engineering
D.com