Muhammad Afzaal M

Muhammad Afzaal

Gujrat, Gujrāt District

This professional is in active search of jobs

engineering Freelancer

About me:

I'm joinery and Finishing Foreman with more than 15 years of experience in maintenance, installation and repair work of Furniture, wardrobe, cupboard, furniture assembly, door's, door frame, gypsum work, false ceiling etc 

Experience:

Azmeel contracting and construction Dammam, Saudi Arabia 

Finishing Foreman 

(2015-2021)


 

Job Description 


 

  • supervise a crew of     journeyman carpenters involved in detailed aspects of the carpentry trade.
  • Reviews project plans and blueprints and designs jobs with individuals requesting work. 
  • Estimates time, materials, equipment and supplies needed.
  • Develops work schedules and crew assignments. 
  • Inspects work areas to insure job is being completed as agreed.
  • Evaluates staff performance.
  • Completes time sheets, accident reports, and work orders. 
  • Trains staff in related work assignments. 
  • Maintains records of operation. 
  • Monitors inventories and requests supplies and equipment. 
  • Insures work areas are properly maintained.
  • Perform rough and finish carpentry including building additions and remodels cabinets, tables, chairs, therapeutic appliances, and special products. Builds and patches roofs. 
  • installs floors and wall coverings, ceiling material, paneling, plastic laminates, and hardware. 
  • Repairs broken windows, doors, walls, ceilings, and furniture; installs door jambs and hangs metal and wood doors. 
  • Constructs and letters signs. Finishes walls with wood, structural metal, lath, and plaster; repairs/replaces railings, handrails, stair treads, nosings and gratings. 
  • Builds platforms, podiums, partitions, ramps, and fences; installs insulation and weather stripping. 
  • Maintains and repairs machinery, tools, and equipment used in the carpentry trade. 
  • Installs towel racks, dispensers, pictures, and curtains. 
  • Nay paint, stain, and restore antiques.

     

  • Reviewed plans and specs during the schematic design of pre-construction.
  • Worked with construction administration consultants to plan field observations on schedule.
  • Determined the project schedule, which included the sequence of all carpentry activities.
  • Provided safety kits to all construction personnel, which complied with safety protocols for the job site.
  • Reported the quality of performance on site to all site construction managers.
  • Guided and directed third-party inspectors through project construction, commissioning and closeout.
  • Avoided construction delays by efficiently following through with all site inspections in a timely manner.
  • Coordinated with segment leaders to promote architectural goals and design concepts.
  • Devised overall strategy for documentation and identified the sheets planned for each stage of the work.
  • Installed drywall, ceilings, trim and fabricated replacement trim and moldings.
  • Aligned and squared frames and forms for installation.
  • Built and hung custom doors and frames.
  • Constructed residential decks, carports, garages and sunrooms.
  • Constructed safety provisions, including scaffolding, gang ladders, perimeter railings, fall protection and temporary covers.
  • Installed access controls for mechanical gates, including safety loops, receivers, remotes and keypads.
  • Planned and executed work with the proper tools and materials to maximize efficiency.
  • Set and built form systems and set embeds.
  • Read and interpreted blueprints and construction documents to determine project directives.
  • Installed access controls for mechanical gates, including safety loops, receivers, remotes and keypads.
  •       Supervised and installed wall panelling, shelves, benches, timber ceiling, door frame, steel skarting.
  • Installed kitchen, wardrobe.
  • Wood door ceiling partition.
  •  

          Aramco Housing Scheme Dhahran Khuber


 

  • Start finishing work of 300 villas.
  • Installing door frames and wood doors.
  • Kitchen cabinets wardrobe ceiling and partition.
  • Marble tiles and bath room accessories.
  • Clay tiles 


 

          Sharif carpentry & decor (LLC Dubai)

          Designation: charge Hand (2008-2014)


 

Projects:

           Eastern international (international city Dubai)

  • Installation of door frame and clay tiles
  • Conducted site surveys with contractors
  • Site Inventory Management, Delivery Sign-offs, documentation handling


 

           Ginco group of companies (jumerah village Al-barsha)

  • Managed and supervised 15 members of team to meet the dead line of 92 villas
  • Conducted site surveys with contractors
  • Site Inventory Management, Delivery Sign-offs, documentation handling
  • installation and assembling of kitchen cabinets door frames, false ceiling


 

          Brook field multiplex (standard chartered bank)

  • installation of door frames, sliding doors, office cabinets
  • Conducted site surveys with contractors
  • Site Inventory Management, Delivery Sign-offs, documentation handling




 

          Brook field multiplex (foremarke school Dubai)


 

  • supervised and installed wall panelling,shelves,benches,timber ceiling, door frame, steel skarting
  • Conducted site surveys with contractors
  • Site Inventory Management, Delivery Sign-offs, documentation handling

What kind of projects is Muhammad Afzaal looking for?

Maintenance.,installation, Facility maintenance 

0 external recommendations