beBee background
Professionals
>
Engineering / Architecture
>
Nowshera
Engr Muhammad Ismail khan

Engr Muhammad Ismail khan

Automation Engineer
Nowshera, ضلع نوشہرہ

Social


About Engr Muhammad Ismail khan:

Dear sir
Hope you will be fine.
I am Muhammad Ismail khan from Pakistan working in Pakistan top rank cement industry CHERAT CEMENT COMPANY LTD.
I have more than 12 years of experience in cement industry in the field of Electrical and Automation system.
During the his duration  I have done lot of major projects and daily maintenance work .
I have done installation and commissioning of Cherat Cement Company Line 2 4200t/d Sinoma and 7200 t/d Sinoma plant upgradation of ball mill to roller press with Main DCS system Siemens PCS 7 on WinCC  and  local control system  S7 300 series and S7 1200 series with TIA portal.I want to improve my technical and soft skills to move in a multi national organization.
So help me out to fulfil my dream and become a member of your respective organization.
Check my Profile and feel free to contact 
Thanks and Regards

Muhammad Ismail khan
Senior deputy Manager 
Electrical and Automation 
 

Experience

SENIOR DUPTY MANAGER AUTOMATION: March 2011 -  Till DATE.

Presently in charge of Operation, Maintenance and troubleshooting of line 1, line 2, Line 3 And WHR, s.Automation control system. 

About Cherat Cement Company:

Cherat Cement is a leading industry in Cement sector in Pakistan having a total capacity of 15300TPD with 6.3KV MV system and Siemens installed PCS 7 DCS system and Variable speed drives. Also having its own 39MW diesel/Furnace oil/Gas power plant (Wartsila) and 18MW WHR(West Heat Equerry) system and  13.6MW solar Energy plant.

Solar Plant: The installation of 13.6 MW solar plant producing 45000units/day average which optimizing power cost of cement production. While further 7MW extension in progress.

Main Functions: 
Responsible to ensure the correct implementation of the project quality plan and quality procedures and productivity related to all  Electrical And Automation works in accordance with program of work on site.
Duties & Responsibilities: (Other duties may be assigned)

  •  Coordinate with the HOD regarding all Automation activities. 
  • To be fully aware of the Automation Programs of Main and Local PLC systems.
  •  Prepare maintenance work plan for all PLC Equipment’s and panel.
  • Being on senior position manage duties and responsibilities of subordinates.
  • Ensure that all Automation site activities are conducted under controlled conditions as per drawings.
  • Ensure safety work environments. 
  • Maintaining spares in store to fulfill emergency requirement. 
  • Updating store related work through SAP(S4 HANA).
  • Follow-up maintenance activities in shutdown.
  • Coordination with concern department related to any plant modification. 

Technical Skills: 

Automation Experience:

  • Hand on experience on Troubleshooting and operation of SIEMENS PLC’s PCS7 v8.0 and v9.1  CPU 410 5h.
  • Working on PLC software (SIMETIC MANAGER).
  • Hand on experience on WinCC .
  • All new modification in plant i.e Group, motor, valve and damper. With CEMAT library
  • Working on Step 7 programming (CFC,SB and Ladder Logic.)
  • Maintaining backup for Main PLC,s and  local PLCs (S7 200,300 series,1200 series and 1500)

With there HMI.

  • Developing SCADA (Mimics and HMI) for plant PLC on WinCC v6, v7.3, v9.1 and 8.0, TIA Portal versions, and PMIS system.
  • Responsible of new modification in plant according to process requirement. and maintain its modification form record through ISO documentation.
  • Centralizing the Line 1, Line 2 and Line 3 CCR, s during COVID 19.
  • Modification in Roller Press local PLC on Production requirement for smooth operation at line 2 and line 3.
  • Programming for Circular Stacker/Reclaimer wireless also installation of TIA v16.
  • Software upgradation of line MAIN DCS system from CEMAT 8.1 to CEMAT 9.0 windows 10.
  • Modification in LINE 2 GCT local PLC according to process requirement.
  • Designed complete programming logic and wincc work for line-lll Rice Husk Main Bucket Elevator and spare auxiliary bucket elevator.
  • Engineering station compilation and downloading.
  • Modification in circular Stacker PLC according to higher management requirement. 

Change the circular pile shape to longitudinal shape to solve QC material composition issue.

  • Servers compilation and downloading.
  • Preparation of Engineering station system for PCS7.
  • Preparation of Operator station system for PCS7.
  • Installation of digital and analog I/O, s cards in racks. 
  • Installation of ET-200 IM 153-1 on different panels racks.
  • Hardware loop testing and sitting of PLC cards I.e I/O's cards.
  • Working on PIMS (Plant Information Management System) which is a new Technology in Pakistan.
  • To carry out maintenance of PLC panels.
  • Hardware testing of newly installed S7 hardware. 
  • Pressure Control Loop, Temperature Control Loop, Level Control Loop, & Flow Control Loop
  • Resistance Temperature Detectors (RTD), Thermocouple Sensor& Vacuums Gages Weigh Bridge, Weighing Indicators & Scale.
  • Implementing DCS record in SAP such as Permanent Modification, Simulation.
  • Electrical Drawing for new PCS7  24vdc.

Projects performed at Cherat Cement Company LTD:

1:-Upgradation of Raw Mill(Ball Mill)to Roller Press in Progress

  • Installation and commissioning of Raw Dosing area.
  • Preparing PLC panel for raw press.
  • Hardware and software Complete configuration of field input/out puts according to new drawing.
  • Programming of each equipment in PLC.
  • Designing of operational sequences,
  • SCADA Designing of whole Raw Press area.
  • Testing of field input/output signals.
  • Configuration of interface module. 
  • Commissioning and Programming of FLS Coal Pfisters through profibus cable as a GSD file.
  • Commissioning and Programming of FLS Cooler Hydraulic with main DCS system through Profibus as a GSD file.

 

2:-Erection and commissioning of Line 3(7100t/d) (TCDRI-SINOMA )  date Dec 2018.

  • Checking of all program interlocking in hardware form before project start up. 
  •  Installation of PLC panels according to Single line drawing of all substation.
  • Separate earthing for DCS panels.
  • Installation and splicing of optical fiber of all Ares.
  • Preparation of computer systems for Servers, Engineering station and Operator Stations.
  • Downloading project to all CPU,s according to its hardware and software configuration. 
  • Testing of all digital and analog inputs outputs.
  • Interlocking of equipment’s operation according to process requirement.
  • Programming for FLS Burner according to operation through profibus as a GSD file.

3:-Erection and commissioning of Line 2 plant(4200t/d)(TCDRI-SINOMA ) date November 2016

  • All Electrical and control work of project
  • Single line drawing of all substation.
  • Single line drawing of main new grid.
  • All MV and LV panel installation and commissioning.
  • Earthing of line 2.
  • Erection and commissioning of following area.

1.Gypsum Crusher

2.Raw Press

3.Preheater

4.Cooler 

5.Cement Mill

6.Packing

4:- Up gradation of Line 1 PLC Siemens S5  control system to latest Siemens  PCS7  v8.1.

  • Project selection in different quotation.
  • Study of quoted project in detail.
  • Complete study of existing electrical drawings, plc panels looping. 
  • Electrical panel looping Drawing for new PCS7 which   24vdc.
  • Panel installation of new input/outputs.
  • Configuration of field input/output signal according to new drawings.
  • Conversation of different relay control logic to main PLC.
  • Programming of different major Equipment’s at Siemens Karachi office.
  • FAT test with on simulation at SIEMENS Karachi office.
  • Verification and Testing of field signals.
  • Operation of field equipment’s on test mode from Engineering station.

5:-Upgradation of Mix Stacker/Reclaimer RCL system to PLC.

 

  • Mix stacker and mix reclaimer RCL system was upgraded to S7 300  PLC with WinCC Flexible.
  • Power and Control circuit for  mix stacker and mix reclaimeer.   

Computer Skills:

  • Working on SAP (industrial software).
  • Working on Lotus Notes (industrial software).
  • Operating System: MS office, Windows NT/98/2000/XP and Linux

Education

BSc Electrical

 

2011ACECOS University Pakistan
FSc Pre Engineering2006A

PEF College (B.I.S.E BWP)

 

Metric   (Science)2004A

GHSS (B.I.S.E BWP)

 

Professionals in the same Engineering / Architecture sector as Engr Muhammad Ismail khan

Professionals from different sectors near Nowshera, ضلع نوشہرہ

Other users who are called Engr

Jobs near Nowshera, ضلع نوشہرہ

  • Ghullam Ishaq Khan Institute of Engineering and Technology

    Senior Software Developer

    Found in: beBee S2 PK - 3 days ago


    Ghullam Ishaq Khan Institute of Engineering and Technology Swabi, Pakistan Full time

    Latest Senior Software Developer Jobs in KPK February 2023 have been announced for these below vacant posts of Senior Software Developer. Applications are invited from well qualified persons for the following position. In these New GIK Institute Jobs eligible male and female cand ...

  • Planning and Development Department kpk

    Planning and Development Department Jobs

    Found in: beBee S2 PK - 1 week ago


    Planning and Development Department kpk Peshawar, Pakistan Full time

    Planning & Development Department KPK Jobs in Peshawar February 2024 has been announce through Latest advertisement The Project Coordination and Monitoring Unit (PCMU) will help in intensive monitoring and coordination for P&DDD and the Steering Committee and provide technical su ...

  • Fazaia College of Education For Women

    Lecturer Jobs

    Found in: beBee S2 PK - 15 hours ago


    Fazaia College of Education For Women Peshawar, Pakistan Full time

    Latest Fazaia College of Education For Women Peshawar Jobs July 2023 has been announce through Latest advertisement Applications are invited from the qualified, competent and committed candidates for.In these latest Govt Jobs in KPK the Male and Female candidate can Apply in thes ...