About asim khan:


Profile Summary: 
Broadly skilled Civil Engineer with 12 years site experience in infrastructure, earth works, building, pipeline mega projects industry with strong interpersonal skills and providing solutions when working with a team of professionals to meet or exceed project goals. Recognised as a key contributor for project execution, RFI submitting, preparing procurement program and working with vendors & sub-contractor to supervise and coordinate the project.

 

Experience


Company;    Hillheight hotel construction project kalam swat Pakistan 
Role;             project manager/ owner.

Project -01: Working as  project manager at hotel construction project ( dec2020 tilldate).

Construction & supervision of multi-storey commercial building.
• Checking out estimate of building materials.
• Monitor safety works at site and participate in monthly safety meeting.
• Coordination with project sub-contractors & supplier.
• Coordination with architecture & surveying team.
• Coordination with lab for different types lab testing and sampling at site.
• Making progress reports & schedules on daily, weekly, monthly basis & monitoring & updating the same.


Company:  Al Rashid Trading & Contracting Company Ltd., al jouf sector, Saudi Arabia
Role:  site manager.
   Super

• Project -02: border guard development program at al jouf sector. (April-18 till dec-2020).

Working as Site Manager/Civil engineer on ministry of interior project.
• Responsible about infrastructure works, precast erection& external works for (RRS) rapid response stations total 12 numbers of buildings.
• Supervision of pre-cast erection, alignment, grouting etc.
• Estimation for all required materials at RRS buildings & follow ups with HO, suppliers.
• Follow-up for trenching excavation works, back fill works earth works etc.
• Responsible about installation and Trenching for underground utilities like pump room, generator room, septic tank, sewage line, electrical main line, telecom line, potable line, fire hydrant line etc as per drawings and project specification.
• Follow-up for trenching excavation works, back fill works earth works etc.
• Responsible for all external road, walk way, car parks construction preparation of sub-grade, sub-base, bas course, wearing course.
• RFI's submission and carry out inspection with Consultant Engineer at site.
• Monitor safety works at site and participate in monthly safety meeting.
• Coordination with project sub-contractors & supplier.
• Coordination with lab for different type’s lab testing and sampling at site.
• Discussing the technical matters with consultants' & clients' representatives & forwarding the same to Site Staff.
• Prepare schedule and coordinate with Consultant Engineer for future RFIs.
• Making progress reports & schedules on daily, weekly, monthly basis & monitoring & updating the same.
• Follow ups with border guard authorities for work permit.

 

 


• Project -03:  King Abdullah Security Headquarters, Ministry of interior Phase IV (KAP-4)(June2015 till April 2018.

Working as Project engineer/Site Manager for external works on ministry for security planning and development agency KP4 building project.
• Responsible about infrastructure works, road works & concrete pouring at Civil Defense KP4 project. 
• Estimation and Material Take-off for concrete.
• Follow-up with Bitching Plant 3rd party on regular basis.
• Responsible about installation and Trenching for underground utilities like sewage line, electrical main line, telecom line, potable line, fire hydrant line etc as per drawings and project specification.
• Responsible for all external road construction preparation of sub-grade, sub-base, bas course, wearing course.
• RFI's submission and carry out inspection with Consultant Engineer at site.
• Monitor safety works at site and participate in monthly safety meeting.
• Coordination with project sub-contractors & supplier.
• Coordination with lab for different types lab testing and sampling at site.
• Discussing the technical matters with consultants' & clients' representatives & forwarding the same to Site Staff.
• Prepare schedule and coordinate with Consultant Engineer for future RFIs.
• Making progress reports & schedules on daily, weekly, monthly basis & monitoring & updating the same.


• Project -04: Ras Al-Khair – Riyadh Water Transmission System (Dec2012 toJune 2015).

Worked as Engineer/Site Manager on SWCC - Ras Al Khair Riyadh Water Transmission System and supervising eight crew at a time.
Monitoring & supervision for carbon steel pipe line in side Riyadh city for SWCC.
• Monitoring & supervising up to eight crew on different activities of project.
• Coordination with Sub-contractors for pipe laying, backfilling, asphalting and other civil works.
• Restoration of asphalt road works as per roads authorities such as sub-grade, sub-base, wearing course, base course, walk way, curb stone electrical poles etc.
• Monitoring RIP RAP stone pitching works at wadi sloping area for pipe line project.
• Coordination with sub-contractors for thrust boring site for the different locations of project.
• Coordination with head office for material and follow up with material suppliers.
• Coordination with Riyadh traffic deportment for road area activities.
• Coordination with Riyadh municipality for work permit.
• Coordination with 3rd party lab for the different types of lab test & submit to consultant.
• Supervision for Pre-Cast element workshop (Drain, vent shafts, epoxy manholes, wall extensions and protection slabs) for SWCC project.
• Preparation of quantity for concrete and other material for precast work shop.
• Follow up with ready mix plant for booking & scheduling of concrete.
• During casting of concrete checking slump cone test, temperature for quality as per specification.
• Crushing of cone cylinder 7days, 28days with consultant engineer at lab.
• Chloride penetrability water permeability test on monthly basis with consultant engineer at lab.
• Installation of pre-cast elements as per site condition, making bituminous course and water proofing membrane
• Coordination with sub-contractor for connection and installation of values for different type of chambers at site.
• Site inspections with consultants' & clients' representatives for different activities of the project, such as Trenching, bedding, pipe laying, backfilling, asphalting, water proofing
• Monitoring safety works at different locations and participating in safety monthly meetings.
• Discussing the technical matters with consultants' & clients' representatives & forwarding the same to Site Staff.
• Making progress reports & schedules on daily, weekly, monthly basis & monitoring & updating the same.
• Submitting & following up with RFIs approval to consultant.
• Checking & verifying the quantities of the executed activities.
• Preparation of Daily Progress Report.

 


Project- 05:  SWCC - Jeddah Water Network Project (Jan2011- Dec2012)

Worked as Site Engineer on SWCC - Jeddah Water Network Project at Jeddah.
• Supervision and layout of various structure works, earth works and surveying works for SWCC Jeddah Water Network Project - Jeddah.
• Site inspections with consultant& clients' representatives for different activities of the project, such as Trenching, bedding, pipe laying, backfilling, asphalting, water proofing.
• Preparing hydrostatic test for ductile iron pipes.
• Restoration of asphalt road, preparation of road structure such as sub-grade, sub-base, wearing course, base course, walk way, electrical light pole etc.
• Discussing the technical matters with consultants' & clients' representatives & forwarding the same to Site Staff.
• Making progress reports & schedules on daily, weekly, monthly basis & monitoring & updating the same.
• Submitting & following up with RFIs approval to consultant.
• Checking & verifying the quantities of the executed activities.
• Preparation of Daily Progress Report.

 

• References
Available on request.

 

Education


• B-Tech (Honors), Civil Construction & Highway Tech Al-Khair University (AJK) - Islamabad, Pakistan.
• Diploma of Associate Engineer, Civil Technology, N.W.F.P Board of Technical Education - Peshawar, Pakistan

 

Professionals in the same Construction / Facilities sector as asim khan

Professionals from different sectors near Swatai, Swāt District

Other users who are called asim

Jobs near Swatai, Swāt District

  • International Islamic University

    Admin / Assistant

    Found in: beBee S2 PK - 5 days ago


    International Islamic University Balakot, Pakistan Full time

    Latest International Islamic University Balakot Campus Jobs December 2022 has been announced through the latest advertisement and university is looking teaching and non teaching staff to full fill these posts. Applications are invited from the citizens of Pakistan for these posts ...

  • Forest Department

    Civil Engineer

    Found in: beBee S2 PK - 8 hours ago


    Forest Department Swat, Pakistan Full time

    Latest Civil Engineer Jobs in KPK February 2023 has been announced for the latest vacant positions in the department through the new advertisement published in Jang Newspaper for the hiring of individuals. Applications are invited from suitable candidates for the following vacant ...

  • Swat Institute of Medical Sciences & Research Center

    Admin Officer

    Found in: beBee S2 PK - 1 day ago


    Swat Institute of Medical Sciences & Research Center Swat, Pakistan Full time

    New Administrative Staff Jobs in KPK March 2023 have been announced for the below vacant posts through an advertisement and seeking for the interested applicants for these job openings. Swat Institute of Medical Sciences and Research Centre is state of the art 220 bedded hospital ...