beBee background
Professionals
>
Engineering / Architecture
>
Lahore Cantt
Affan Sadiq

Affan Sadiq

Lead Process Engineer
Lahore Cantt, Lahore District
(0)

Social


About Affan Sadiq:

Dear Sir,

Hopefully, mail will find you in best of spirits. Please find attached and my Company Profile. Below, is my brief Career out line.

I am a Chemical Engineer, with almost 22 years of diversified Experience in Process Design, Process Safety, Process Optimization, Operations Support, commissioning & Projects Coordination.   

I have remained vital part of the different Mega Projects in important phases of Project life Cycle. These include Select, FEED and Execute Phases.  

I have worked in major Capital Projects with EPC contractors and Consultants like ABB, Clough, BiLFINGER Tebodein, CH2MHILL, XODUS, ENAR Petrotech and DESCON Engineering.  

My core industrial exposures are in upstream Oil & Gas, Power Generation and Petrochemical Sectors. I have worked with leading National and Multinational organizations including DESCON, OMV & PDO-SHELL.  

I am a Chartered Engineer in Process Design & Registered Process Safety Engineer with IChemE. I am a Senior Member of AICHE. My Application for getting FSE (Functional Safety Expert status with "Exida") is also in progress. 

I have recently started my own consultancy firm, "Process Edge" aims to provide solutions in fields of Process, Process Safety Engineering, Energy Optimization, Emissions Reduction &Waste water treatment. Process Edge is technically well equipped to provide day to day solutions to its clients. 

The Process Edge has list of satisfied customers not only in Pakistan but internationally as well. 

The Process Edge has Provided services to renown national organizations including MOL,Engro vopak, OGDCL, PARCO, BYCO and PPL. The Process Edge has also provided services internationally to ADNOC and Iraq National Oil Company

The Process Edge has access to all modern day soft wares like like HYSIS/ UNISIM , PHAST & Shell Fred, Pipesim, Flarenet, PHA Works & exSILentia. At Process Edge we work in line with guidelines of International Engineering standards and practices like APIs and DEPs.

At Process Edge, we have experts available with good experience of managing Contractors and Vendors from Client Side during Concept, FEED, Detail Design and commissioning stages of the Projects.

We also have professionals with good sound experience of reviewing Process Engineering Documents including, P&IDs, H&MB, BOD, Simulation Reports, Design Adequacy report, Piping hydraulics reports, Flow transient Analysis, Piping Layout, Flare Calculation reports, Equipment Sizing Report, Plant Control and Shutdown Philosophies, Functional Control narratives, Gas Dispersion analysis. Process Safety Studies including HAZOP, SIL-LOPA and Bow-Tie Session reports and close outs. For more details please see my resume.

Please do consider profiles for any upcoming position / project.  

Affan Sadiq

 

Experience

WORK EXPERIENCE 

 

Chief Technical Consultant Process Edge Proprietors Jan 2019- To date   

 

The Company is Providing Consultancy in Process Design, Process Safety, Energy Optimization & Waste Water treatment areas. I have coordinated and executed following jobs 

 

  • Chaired HAZOP Session for Majnoon Field Project, for Basra Gas Company through Etlalat, Iraq.
  • Chaired HAZOP Session at BYCO Refinery for Naphtha Hydro treater & Gas Recovery Plants.
  • Chaired HAZID & HAZOP Studies for PARCO-PEARL LPG storage loading/ unloading facilities
  • Detail Engineering design for utilities Plant with DESCON for PDH Plant
  • Piping Hydraulics and Control valve sizing for PPL-Pakistan
  • Pressure relief valves & Flare header sizing calculation for ILF – Pakistan
  • Led Energy Optimization & Predictive Maintenance sessions for “ADNOC” Gas Processing
  • Completed Wellhead vent stack Dispersion Analysis on DNV PHAST for ADNOC Group.
  • Hazardous Area Classification study for OGDCL Qadirpur Gas Plant
  • Chaired HAZOP Session for OGDCL Qadirpur Gas processing field (including gathering stations, FEC, inlet separation, Gas processing train using Memguards & UOP Membrances, Sales gas metering & Permeate stream compression along with plant utilities) 
  • Performed Concept selection for Gas Sweetening & LPG Extraction technology for Mehar Plant.
  • Chaired SIL/LOPA HAZOP & Session for MOL, Pakistan Maramzai Compression Project
  •   Completed Tank Emissions Calculations for ENGRO Vopak Limited
  •  Plant Piping Hydraulics & Control Valve Sizing Calculations for Pakistan Petroleum Limited
  •  Performed PSV Sizing calculations as part of Flare header design for Gas Processing Plant
  •  Completed 35 TPH, 34 Bar WTB & BFW Pumps RFQ for Brillante Engineering, Lahore
  • Did Sizing for Design & Hydraulics Finger Type Slug Catcher Calculation for Brilliante Engineering, Lahore
  • Completed OGDCL, Sanjhoro Gas plant Produced Water DBN Study

 

Senior Concepts Engineer, PDO-Shell, Oman (March 2014- to July-2018)  

       

PDO operates in a concession area of about 100,000 km2 (one third of Oman’s geographical area), Royal Dutch Shell Has 34% shares in the Company. PDO follows Shell Systems & DEP. 

 

 

MAIN PROJECTS:

YIBAL REJUVINATION PROJECT:

Yibal plant has the capacity to process approx. 200000 Sm3/day of Gross fluids including 70 MMSCFD Gas. The Project was launched to replace piping and Equipment due to integrity issues. Projects includes optimizing the Equipment sizing and adding compressors to recover associated gas to make sure zero flaring. The Project worth is approx of 600 Million USD.

 

  • Worked as Senior Process Engineer in the Project right from concept stage to Execute phase.

MAJOR ACHIEVEMENTS

 

  • Presented & demonstrated proposal of downgrading wellhead flow lines from ANSI # 600 to ANSI # 300 for new lines to be laid & MSV Skids from ANSI #900 to ANSI #600, as a result of technology shift from Gas lift to ESP. thus Saving Potential of US $500000 
  • Proposed to include/ consider new MSV skids as part of well head flow line IPF system to down grade MSV Pressure rating & hence decreasing required SIL for rest of the system.
  • Proposed to drain & commission existing & new GRE Headers one by one instead of doing together to optimize shutdown time & Hence Potential 2 days advantage for production.
  • Won as YRP Project  team  “Value Engineering & Economics Award, 2017, ” in Silver Category

 

    Lead -Process Engineer OMV GmbH (March 2008 to April 2014)                           

       

With Group sales of EUR 42.65 bn. & a workforce of around 29,000 employees, OMV is one of Austria’s largest listed industrial companies. OMV had proven oil & gas reserves of approximately 1.12 bn. BOE.

 

MAJOR ACHIEVEMENTS

 

  • Successfully achieved production 02 Months earlier than Scheduled (65-70 MMSCFD) from Latif Block of wells at SAWAN Gas Plant through unique application of FA Study & Processing scheme Optimization.
  • Optimized the Fuel Gas consumption of Gas Turbine by mixing it with Membrane Permeate gas at KCF.
  • Trouble shooting of Silica Gel based Adsorption unit to handle heavy hydrocarbons in feed gas.
  • Troubleshooting of the Nitrogen generation package inadequate performance.
  • Sawan Flow lines Debottlenecking by looping to reduce higher pressure drop in the Flow lines.
  • Presented & demonstrated proposal at KCF to increase Gas production by approx 20-25 MMSCFD taking advantage of changed gas composition, existing equipment & involving slightest modifications.
  • Launched idea & completed case study of using Mitsubishi CO2 Capture/Absorption technique from flue gases to use for Gas Sweetening at Low operating pressure & thus decreasing CH4 in waste stream

  PROJECTS

  • MEHAR GAS FIELD DVELOPMENT PROJECT

Scope starts with Concept development of Mehar gas field with production capabilities of 30 MMSCFD sales gas, 3300 BPD condensate & approx. 50 TPD LPG. The project is worth of approx 100 million US $.  The Facility mainly comprises of Gas sweetening, dehydration, HCDP control, CSU & LPG extraction units

SAWAN GAS FIELD FRONT END COMPRESSION PROJECT 

Scope includes installation of compression station with four centrifugal compressors at the Sawan gas plant(Compression capacity of 380 MMSCFD gas).The station includes four Siemens ISO Rating 7680 KW  turbines & complete utilities system & tie in with current plant. The project worth  approx.. 160 million US $.

  • TAJJAL GAS FIELD DEVELOPMENT & COMPRESSION PROJECT

Scope includes installation of wellhead facilities, flow line & reception facilities for Tajjal gas field. Installation of  Compression stations along with concept selection for location and machinery type selection. complete utilities was also part of scope..

 

 

KADANWARI CENTRAL FACILITY DBN PROJECT

Project iwas intended to evaluate possible ways of increasing sales gas production by 30-40 MMSCFD. The possible options include plant parameters optimization, by pass split stream across bottle necked units & evaluation of performance of High Selectivity membrane Elements.

MIDDLE INDUS BASIN GAS PLANTS OPTIMIZATION STUDY

Scope included evaluation of different strategies to optimize the utilization of three gas processing plants considering the Life of various gas fields located in the Middle Indus basin region. Responsibilities included development & evaluation of strategies considering the Life of fields, & coordination with stakeholders

 LATIF FIELD DEVELOPMENT AND PROCESSING AT SAWAN FACILITYE 

The Projects intends to develop Latif field. Install compression stations at selected wells. Flow line Engineering, and Latif Gas Processing at SCP (SAWAN Central Plant). That includes Evaluation of whole Sawan plant for processing Latif field gas and add facilities accordingly.

                      PROCESS DESIGN ENGINEER (Jan 2005 to March 2008)  DEL

 

MAIN PROJECT:    PACKAGES 200 TPH BOILER 

 

Description of Project: EPC of 200 TPH superheated, high pressure water tube boiler for PACKAGAES (PAKISTAN) Limited, The project was designed to meet the requirements of power generation & steam used at different Equipment of the plant.

KEY RESPONSIBILITIES:

  • Basic Process Design Calculations. 
  • Detailed Engineering for Complete water & Steam piping of Boiler, Sizing of BFW Pumps & Steam Drums.
  • Trouble Shooting & Report writing For ICI Kheowra Water Tube Boilers
  • Worked on Power plant simulator for design & Rating of FTB, WTB, & Combine Cycle Power Plants 

Achievements: Worked on the unique project of Fire Tube Boiler Standardization, in this capacity,

Standardized the Thermal Design of Complete range of FTB from 03 to 25 TPH based on EN-Code Requirements.       

 

ASSISTANT MANAGER (Chemical) (APRIL 2002 to JAN 2005) NDC Petrochemical Complex   

                                                                 

Assistant Production Manager Duties at a Petro Chemical plant meant for production of the Polyol butadiene.

 Installations Overview Stirred Tank reactors, Water Bath Heaters, Falling Film Evaporators, Ethanol Recovery System through Packed  Extractive & Vacuum Distillation Columns, Cooling Water System, &Storage facilities

     Duties & responsibilities:

  • Monitoring & controlling the process parameters to make sure smooth run of the plant.
  • Responsible for implementing safe working procedures at plant includes proper training of workforce, proper h&ling & storage of chemicals & classification of plant areas in to different hazard zones
  • Trouble shooting & Plant Performance optimization.
  • Developing & implementing SOPs, Check lists, Start up, Shut down & Transfer Procedures
  • Coordinated certification & surveillance audits of ISO 14001 & OHSAS 18001

 

 SHIFT ENGINEER (FEB 2001 to MAR 2002) FFBL, KARACHI

 

Installations OverviewPower Generation, through Two ISO rating 19.6 MW each, mark VI, GE Gas Turbines, working  in combination with HRSG, Auxiliary boiler, Superheated Steam Generation & distribution network, DEMIN water production facility , Cooling water distribution & treatment network, Instrument Air & Service Air Production systems.

Job Overview:

  • H&ling Shift affairs ,Preparation of weekly & Monthly production reports, Got basic familiarity with PTW system 
  • Basic training on DCS System, Arranged & Participated in Safety & Emergency talks.

 

 

Education

Skill Enhancement Courses/ Certifications

 

  • IChemE Chartered Engineer Gold Status   
  • Senior Member AICHE
  • Professional Process Safety Engineer       
  • Professional Engineer , Pakistan Engineering Council
  • HYSIS Dynamic modeling, with ASPEN TECH, PAKISTAN
  • FSE with Exida, (In Process)
  • HYSIS Upstream, Aspen Flare System Analysis, Hysis EDR with ASPEN TECH, PAKISTAN
  • Complex Hydro Carbon Treating with SHELL.
  • Oil & Gas Separators Process Design through Shell Open university
  • Fractional Distillation Process Fundamentals through Shell Open University
  • FLOW Assurance with Schulumberger, Oman
  • Apply, prepare & Lead HSE RISK Management Training Courses with SHELL Netherl&s at Oman
  • HEMP (HAZARD & Effect Management Process) Training with SHELL Canada through 
  • Asset integrity Process Safety Management training for Designing Barriers with PDO Oman.
  • KED, the Boiler Thermal Design Software training with KED Germany.
  • Role of Line Management in Safety, DESCON Head Office, Lahore 
  •          Academic Qualification
  • Bachelor of Science in Chemical Engineering (Mar1995 to May 2000) UET, Lahore – PAKISTAN. 

Masters in Business Administration, (August 2007- August 2009)       IBA, University of Punjab, Lahore-PAKISTAN, Majors:  International Marketing

Professionals in the same Engineering / Architecture sector as Affan Sadiq

Professionals from different sectors near Lahore Cantt, Lahore District

Other users who are called Affan

Jobs near Lahore Cantt, Lahore District

  • Punjab Land Record Authority

    Assistant Director Jobs

    Found in: beBee S2 PK - 3 days ago


    Punjab Land Record Authority Lahore, Pakistan Full time

    Latest Punjab Land Records Authority PLRA Jobs March 2024 has been announce through Latest advertisement Punjab Land Records Authority (PLRA) intends to hire the services of experienced IT specialists on contract basis for the period of three (3) years (extendable on satisfactory ...

  • Wapda

    NTDC Latest Jobs 2024

    Found in: beBee S2 PK - 3 days ago


    Wapda Lahore, Pakistan Full time

    Today Jobs, this page informs you NTDC National Transmission and Despatch Company Limited today in Leading Newspaper for Males and Female Applicants. NTDC Latest Jobs 2024 Wapda is looking the services of Excellent and Experienced applicants for the posts given below from Pakista ...

  • Finance Department Punjab

    Finance Department Jobs

    Found in: beBee S2 PK - 1 day ago


    Finance Department Punjab Lahore, Pakistan Full time

    Latest Finance Department Punjab Jobs in Lahore December 2023 has been announce through Latest advertisement Corporate Finance Unit has been established in Finance Department, Government of the Punjab. It provides expert advice, assistance and opinion to Public Sector Companies w ...